As per NPCP; which of the following statement is true about cleanouts?
B. Each horizontal drainage pipe shall be provided with a cleanout at its upper terminal and each run of piping which is more than 15 meters in total developed length.C. Each cleanout, unless installed under an approved cover plate, shall be below grade, readily accessible. And so located to serve the purpose it is intended.D. Cleanouts shall not be provided for pressure drainage systems.